New Mexico Register / Volume XXXVII,
Issue 21 / November 3, 2026
This is an amendment to 17.9.568 NMAC, Sections 2 and 7,
effective 11/3/2026.
17.9.568.2 SCOPE:
A. This
rule, and the definitions, standards, procedures and screening processes
described herein apply to every [electric utility including rural electric
cooperatives and] investor-owned [utilities]
utility operating within the state of New Mexico that [are] is
subject to the jurisdiction of the New Mexico public regulation
commission. These standards and
procedures apply to both qualifying and non-qualifying facilities.
B. The
standards and procedures described in this rule (17.9.568 NMAC) apply only to
the interconnection of generating facilities with a nameplate rated capacity up
to and including 10 MW. The standards
and procedures described in 17.9.569 NMAC apply to the interconnection of
generating facilities with a rated capacity greater than 10 MW and are
unchanged by this rule.
C. Interconnection requests are
reviewed based on the combined nameplate ratings of systems accounting for
their export capacity and energy storage operating mode. For purposes of review screens, only the
capacity that is designed to inject electricity to the utility’s distribution
or transmission system, other than inadvertent exports and fault contribution,
will be used.
D. All
interconnection contracts between a utility and an interconnection customer
existing at the time 17.9.568 NMAC is revised and adopted shall automatically
continue in full force and effect. Material
modifications to existing facilities or operations require a new
interconnection application and agreement and will be subject to review under
the current conditions of the electric power system. Any changes made to existing interconnection agreements
shall conform to the provisions of 17.9.568 NMAC in effect at the time
modification is executed.
[17.9.568.2 NMAC - Rp, 17.9.568.2 NMAC, 02/14/2023, A,
11/3/2026]
17.9.568.7 DEFINITIONS: Terms used in rule
17.9.568 NMAC shall have the following meanings:
A. Definitions beginning with “A”:
(1) Applicant means a person or an entity
that has filed an application to interconnect a generating facility to an
electric power system. An applicant may include:
(a) A customer who applies for
interconnection of a generating facility that will offset part or all of the
load of a utility customer, the applicant is that customer, whether the
customer owns the generating facility or a third party owns the generating
facility.
(b) An owner of a generating facility that
applies for interconnection of a generating facility that sells electric power
to a utility.
(c) A subscriber organization as defined
by the Community Solar Act, Subsection M. of Section 62-16B-2 NMSA 1978.
(2) Area network means a section of an
electric power system served by multiple transformers interconnected in an
electrical network circuit, generally used in large, densely populated
metropolitan areas, to provide high reliability of service. Area network has the same meaning as the term “grid network” as
defined in IEEE Std 1547.6™. An area network is also referred to as a grid
network or a street network.
(3) Auxiliary load means electrical
power consumed by any equipment necessary to operate the generator or energy
storage system. This is intended for in-front-of-the-meter systems.
B. Definitions beginning
with “B”: Business day means Monday through Friday, excluding holidays observed by
the utility.
C. Definitions
beginning with “C”:
(1) Certified means equipment has been
tested in accordance with the applicable requirements of IEEE Std 1547™-2018
and IEEE Std 1547.1™-2020 by any nationally recognized testing laboratory
(NRTL) recognized by the United States occupational safety and health
administration to test and certify equipment pursuant to the applicable
standard and the equipment has been labeled and is publicly listed by such NRTL
at the time of the interconnection application. Equipment installed prior to March 28, 2023 will also be considered certified if it has been tested
in accordance with IEEE Std 1547™-2003 and 1547.1™-2005.
(2) Customer options meeting means a meeting designed to review the status of the interconnection application
initial review results, or to determine next steps needed to permit safe and
reliable interconnection.
D. Definitions beginning with “D”:
(1) Detailed study process means the
procedure for evaluating an interconnection application that may include a
scoping meeting, feasibility study, system impact study, or facilities study as
described in 17.9.568.18 NMAC.
(2) Distributed energy resource (DER) means the
equipment used by an interconnection customer to generate or store electricity
that operates in parallel with the electric distribution system. DER may include, but is not limited to: an
electric generator or energy storage system, a prime mover, or combination of
technologies capable of injecting power and energy into the electric
distribution system, which also includes the interconnection equipment
necessary to safely interconnect with the distribution system. DER may not always be interconnected with the
bulk power system. DERs may include
distributed generation (DG) resources, distributed energy storage, demand
response energy efficiency, and electric vehicles and chargers that are
connected to the electric distribution power grid. DERs may be capable of exporting active power
to an electric power system (EPS). The DER includes the customer’s interconnection
facilities but shall not include the area EPS operator’s interconnection facilities.
(3) Distribution service means
delivering energy over the electric power system pursuant to the approved
tariffs of the utility other than services directly related to the
interconnection of a generating facility under these interconnection
procedures.
(4) Distribution
system means the utility's facilities and
equipment used to transmit electricity to ultimate usage points, known as
premises, directly from nearby generators or from interchanges with higher
voltage transmission networks which transport bulk power over longer
distances. The voltage levels at which
distribution systems operate differ among areas.
(5) Distribution upgrade means the
additions, modifications, and upgrades to the utility's distribution system at
or beyond the point of common coupling to facilitate interconnection of the
generating facility and render the service necessary to effect the
interconnection customer's operation of on-site generation. Distribution
upgrades do not include interconnection facilities.
E. Definitions beginning with “E”:
(1) Electric power system (EPS) means the
equipment operated and maintained by a utility (may include: independent system
operators, transmission owner/operator, vertically integrated utilities,
electric cooperatives, municipals, and distribution companies) to deliver
electric service to end-users, including transmission and distribution lines,
substations, transformers, spot networks and area networks.
(2) Energy
storage system (ESS) means any commercially available,
customer-sited system or utility-sited system, including batteries and
batteries paired with on-site generation, that is capable of retaining,
storing, and delivering electrical energy by chemical, thermal, mechanical, or
other means. For the purposes of this
rule, an energy storage system can be considered part of a DER or a DER in
whole that operates in parallel with the distribution system.
(3) Export capacity means the amount
of power that can be transferred from the generating facility to the
distribution system. Export capacity is either
the nameplate rating, or a lower amount if limited using and acceptable means
identified in 17.9.568.12 NMAC.
F. Definitions beginning
with “F”:
(1) Facilities study means a study
that specifies and estimates the cost of the equipment, engineering,
procurement, and construction work needed to implement the conclusions of the
system impact study.
(2) Fast
Track means the process for evaluating an interconnection application utilizing
established screens as described in 17.9.568.16 NMAC.
(3) Fault current means the current
produced during a short circuit on the electric power system measured in
amperes.
(4) Feasibility
study means a preliminary technical
assessment of the proposed interconnection that identifies any potential
adverse system impacts that would result from the interconnection of the
generating facility.
G. Definitions beginning with “G”:
(1) Generating
facility means the equipment used by an
interconnection customer to generate, store, manage, interconnect and monitor
electricity. A generating facility includes the interconnection equipment
required to safely interconnect the facility with the distribution system. DERs
are generating facilities.
(2) Grid network Grid network is also
commonly referred to as area network or street network. For definition, refer
to “Area Network”.
H. Definitions beginning with “H”: Host load means the
electrical power, less the DER auxiliary load, consumed by the customer at the
location where the generating facility is connected.
I. Definitions beginning with “I”:
(1) IEEE means the institute of electrical and
electronic engineers.
(2) IEEE standards means the standards
published by the IEEE, often in collaboration with American National Standards
Institute (ANSI), National Institute of Standards and Technology (NIST), UL,
International Electrotechnical Commission (IEC), CIGRE, and National Fire
Protection Institute (NFPA), available at www.ieee.org.
(3) Inadvertent
export means the unscheduled export of active power from a
generating facility, exceeding a specified magnitude and for a limited duration
generally due to fluctuations in load-following behavior.
(4) Interconnection agreement means a standard
form agreement between an interconnection customer and a utility that governs the
interconnection of a generating facility to a utility’s electric delivery
system, as well as the ongoing operation of the generating facility after it is
interconnected.
(5) Interconnection
application means the request by an
interconnection customer to interconnect a new generating facility, increase
the capacity or make a material modification to the operating characteristics
of an existing generating facility that is interconnected with the utility’s electric
power system.
(6) Interconnection customer means any
person who proposes to interconnect a generating facility with the utility's
system.
(7) Interconnection facilities means
the utility's interconnection facilities and the interconnection customer's
interconnection facilities.
Collectively, interconnection facilities include all facilities and
equipment between the generating facility and the point of common coupling,
including any modification, additions or upgrades that are necessary to
physically and electrically interconnect the generating facility to the
utility's electric power system in a safe and reliable manner. Interconnection facilities are sole use
facilities and shall not include distribution upgrades.
(8) Interconnection upgrade cost
sharing
means the allocation of distribution upgrade costs among multiple generator
facility projects that utilize the hosting capacity created by a distribution
upgrade.
(9) Interconnection procedures means
the procedures specified in 17.9.568.12 NMAC through 17.9.568.23 NMAC.
J. Definitions beginning with “J”: [RESERVED]
K. Definitions beginning with “K”: [RESERVED]
L. Definitions beginning with “L”:
(1) Limited export means the
exporting capability of a DER whose generating capacity is limited by the use
of any configuration or operating mode described in 17.9.568.12 NMAC.
(2) Line section means that
portion of a utility’s electric power system connected to a customer that is bounded by automatic sectionalizing devices or the end of
the distribution line.
M. Definitions beginning with “M”:
(1) Material
modification means a modification to machine data, equipment
configuration or to the interconnection site of the DER at any time after
receiving notification by the utility of a complete interconnection application
that has a material impact on the cost, timing, or design of any
interconnection facilities or distribution upgrades, or a material impact on
the cost, timing, or design of any interconnection application with a later
queue priority date or material impact on the safety or reliability of the
electric power system. A change to the
point of interconnection would require either a new interconnection application
or a change in queue position. A material
modification does not include, for example;
(a) a change of ownership of a generating
facility:
(b) a change or replacement of generating
equipment that is a like-kind substitution in size, ratings, impedances,
efficiencies, or capabilities of the equipment specified in the original interconnection
application; or
(c) a reduction in the output of the
generating facility of ten percent or less.
Replacement of existing inverters with new inverters that conform to new
standards after March 28, 2023, will not be considered a material modification,
so long as the generating facilities output or export status does not change as
a result.
(2) Minimum load means the lowest
measured circuit/substation load regardless of time of day.
(3) Minor modification means any modification
to a utility’s electric power system that involves limited work or low costs.
Minor modifications include, but are not limited to, activities like changing
the fuse in a fuse holder cut-out or changing the settings on a circuit
recloser.
N. Definitions beginning with “N”:
(1) Nameplate rating means the sum
total of maximum rated power output of a DER’s constituent generating units or
ESS, as identified on the manufacturer’s nameplate, regardless of whether it is
limited by any approved means.
(2) Network
system means a collection of secondary
networks, or combinations of such networks on a primary network feeder or
primary network feeders that supply them.
This may also consist of primary feeders networked to supply connected
loads.
(3) Network transformer means a
transformer designed for use in a vault to feed a variable capacity system of
interconnected secondaries.
(4) Non-export or non-exporting means when the DER
is sized and designed using any of the methods described in 17.9.568.12 NMAC, such
that the output is used for host load only and no electrical energy (except for
any inadvertent export) is transferred from the generating facility to the distribution
system.
O. Definitions beginning with “O”: Operating mode means the mode of
DER operational characteristics that determines the performance during normal
and abnormal conditions. For example, an
operating modes can include “export only,” “import only,” and “no exchange.”
P. Definitions beginning with “P”:
(1) Parallel Operation means the simultaneous operation of a generating facility
with power delivered or received by the electric power system while
interconnected. Parallel operation
includes only those generating facilities that are interconnected with the
electric power system for more than 60 cycles (one second).
(2) Parties means the applicant and
the utility in a particular interconnection agreement. “Either party” refers to
either the applicant or the utility.
(3) Person means, for purposes of this rule, an individual, firm,
partnership, company, rural electric cooperative organized under Laws 1937,
Chapter 100 or the rural electric cooperative act, corporation or lessee,
trustee or receiver appointed by any court.
(4) Point of interconnection means the
point where the interconnection facilities connect with the electric
distribution system. Point of
interconnection has the same meaning as the term “point of common coupling” as
defined in IEEE 1547-2018.
(5) Power control system (PCS) means
systems or devices which electronically limit or control steady state currents
to a programmable limit.
(6) Primary
network feeder means a feeder that supplies energy
to a network system or the combination of a network system and other radial
loads. Dedicated primary network feeders
are feeders that supply only network transformers for the secondary network.
(7) Power conversion unit (PCU) means
an inverter or AC generator, not including the energy source.
(8) Premise means a piece of land
or real estate including buildings and other appurtenances thereon.
(9) Protective function means the
equipment, hardware, or software in a generating facility (whether discrete or
integrated with other functions) for the purpose of protecting against
conditions that, if left uncorrected, could result in harm to personnel, damage
to equipment, loss of safety or reliability, or
operation outside pre-established parameters required by the interconnection
agreement.
Q. Definitions beginning with “Q.”: [RESERVED]
R. Definitions beginning with “R”:
(1) Rated capacity means the total AC nameplate
rating of the power conversion unit(s) at the point of common coupling.
(2) Reference point of applicability (RPA)
means the
location where the interconnection and interoperability performance
requirements, as specified by IEEE 1547-2018, apply.
(3) Relevant minimum load means the lowest measured circuit
or substation load coincident with the generating
facility’s production. For solar-only
facilities this shall be the daytime minimum load.
S. Definitions beginning with “S”:
(1) Secondary network means an AC
distribution system where the secondaries of the distribution transformers are
connected to a common network for supplying electricity directly to consumers.
(2) Simplified process means the
procedure for evaluating an interconnection application for a small certified inverter-based DER described in 17.9.568.15
NMAC.
(3) Small utility means a utility
that serves fewer than 50,000 customers.
(4) Supplemental review means
additional engineering evaluation to determine if a generating facility can be
interconnected following the (simplified or fast track) process without the
need for detailed study as described in 7.9.568.17 NMAC.
(5) System emergency means a condition
on a utility system that is likely to result in imminent
significant disruption of service to customers or is imminently likely to
endanger life or property.
(6) System impact study
means a study that identifies and details the electric system impacts that
would result if the proposed generating facility were interconnected without
project modifications or electric system modifications, focusing on the adverse
system impacts preliminarily identified in the feasibility study (if conducted),
or to study potential impacts, including but not limited to those identified in
the scoping meeting. A system impact
study shall evaluate the impact of the proposed interconnection on the safety
and reliability of the electric power system.
T. Definitions beginning with “T”: Technical Interconnection and
Interoperability Requirements (TIIR) documents are public documents, often utility
specific, which include requirements for interconnection, interoperability,
capabilities, and their utilization (settings), and grid integration (e.g.,
protection coordination, telemetry).
U. Definitions beginning with “U”:
(1) UL means the company
by that name which has established technical standards for safe operations of
electrical devices, previously known as underwriter’s laboratory.
(2) UL 1741 CRD for PCS means the certification
requirement decision for power control systems for the standard titled "inverters,
converters, controllers and interconnection system equipment for use with
distributed energy resources”. (March 8, 2019), Underwriters Laboratories Inc.,
333 Pfingsten Road, Northbrook IL 60062-2096.
(3) Unintentional island means an unplanned island per IEEE
1547-2018.
(4) Utility
means a utility or public utility, as defined in Subsection G of Section 62-3-3
NMSA 1978, serving electric customers subject to the jurisdiction of the commission,
excepting rural electric cooperatives.
V. Definitions beginning with “V”: [RESERVED]
W. Definitions beginning with “W”: [RESERVED]
X. Definitions beginning with “X”: [RESERVED]
Y. Definitions beginning with “Y”: [RESERVED]
Z. Definitions beginning with “Z”: [RESERVED]
[17.9.568.7 NMAC - Rp, 17.9.568.7 NMAC, 02/14/2023, A,
11/3/2026]