New Mexico Register / Volume XXXVI, Issue 14 / July 29, 2025
This is an amendment to 19.15.25 NMAC, Section 14, effective 07/29/2025.
19.15.25.14 Demonstrating mechanical integrity:
A. An operator may use the following
methods of demonstrating internal casing integrity for casing repairs and
wells to be placed in approved temporary abandonment.
(1) the operator may set a cast iron
bridge plug within 100 feet of uppermost perforations or production casing
shoe, load the casing with inert fluid and pressure test to 500 psi surface
pressure with a pressure drop of not more than ten percent over a 30 minute
period;
(2) the operator may run a retrievable
bridge plug or packer to within 100 feet of uppermost perforations or
production casing shoe, and test the well to 500 psi surface pressure for 30
minutes with a pressure drop of not greater than ten percent over a 30 minute
period; or
(3) the operator may demonstrate that the
well has been completed for less than five years and has not been connected to
a pipeline.
B. During
the testing described in Paragraphs (1) and (2) of Subsection A of 19.15.25.14
NMAC the operator shall:
(1) open all casing valves during the
internal pressure tests and report a flow or pressure change occurring
immediately before, during or immediately after the 30 minute pressure test;
(2) top off the casing with inert fluid
prior to leaving the location;
(3) report flow during the test in
Paragraph (2) of Subsection A of 19.15.25.14 NMAC to the appropriate division
district office prior to completion of the temporary abandonment operations;
the division may require remediation of the flow prior to approving the well’s
temporary abandonment.
C. An
operator may use any method approved by the EPA in 40 C.F.R. section 146.8(c)
to demonstrate external casing and cement integrity for wells to be placed in
approved temporary abandonment.
D. The
division shall not accept mechanical integrity tests or logs conducted more
than 12 months prior to submittal.
E. The
operator shall record mechanical integrity tests on a chart recorder with a
maximum two hour clock and maximum 1000 pound spring, which has been calibrated
within the six months prior to conducting the test. Witnesses to the test shall sign the
chart. The operator shall submit the
chart with form C-103 requesting approved temporary abandonment.
F. The
division may approve other testing methods the operator proposes if the
operator demonstrates that the test satisfies the requirements of Subsection B
of 19.15.25.13 NMAC.
[19.15.25.14 NMAC - Rp, 19.15.4.203 NMAC,
12/1/2008; A, 7/29/2025]